View materials not shipped

Tekla PowerFab
変更済み: 18 11月 2024
2026
Tekla PowerFab Tekla PowerFab GO

View materials not shipped

There are multiple ways to view materials that remain to be shipped.

The shipping route defines the number of times an item is to be shipped. The required number of shipping assignments matches the number of destinations determined by the shipping route. You can use this information to check which loads have not been shipped yet in the the following ways:

  • In the navigation tree, select Load Number > Unasgn.

    If the route has an intermediate shipping destination, the material may have both a load number for the shipped items and Unasgn for any remaining destinations.

  • Create reports by filtering for the desired destination or destination group.

    Use any of the the multi-truck load reports.

  • On the Production Control ribbon tab, select Load Tracking for a load with a given destination and click Add Material.

    This displays a list of available material assigned to that destination that is not shipped yet.

  • Right-click the production job display grid and select Model Interface. In the Model Viewer Interface dialog, in Colorize By, select Shipping Status.
  • On the Production Control ribbon tab, select Review > Production Status.
    This displays the shipping status broken down by the summary items selected.
役に立ちましたか?
送信
前へ
次へ