XS_CREATE_CONNECTION_WHEN_COPYING_DRAWING_VIEWS
Category in Advanced options dialog: Drawing properties
Set this advanced option
to TRUE to link
lcopied views to the original drawing. This means, for example,
that when you delete a drawing from which you copied a view, Tekla Structures also deletes the copied view. The default value is FALSE.
This advanced option is role specific. When the type SYSTEM(ROLE) is in use, the default value is used. When the type MODEL(ROLE) or DRAWING(ROLE) is in use, you can change the value, which is then the same for all users in the current model.
For more information about using XS_CREATE_CONNECTION_WHEN_COPYING_DRAWING_VIEWS, see the following support
article: What does the XS_
CREATE_CONNECTION_WHEN_COPYING_DRAWING_VIEWS advanced option do?