跳转到主要内容
Trimble
首页
not-allowed-link
  • 简体中文
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • Nederlands
    • Polski
    • Português
    • Suomi
    • Svenska
    • Čeština
    • Русский
    • 日本語
    • 한국어
  • Sign in
  • 简体中文
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • Nederlands
    • Polski
    • Português
    • Suomi
    • Svenska
    • Čeština
    • Русский
    • 日本語
    • 한국어
  • Sign in
This page was written for a different version than you have currently selected. Please use the search or select another version.

Main navigation

  • Home
  1. 首页
  2. Tekla PowerFab
  3. Estimating
  4. Manage estimating items

产品指南

  • Tekla PowerFab 2023 Product Guides
  • Tekla PowerFab 2023 release notes
  • Install Tekla PowerFab
  • Manage Tekla PowerFab
  • Configure and use Tekla PowerFab
  • Combining
  • Estimating
    • Set up the Estimating module
    • Open the Estimating module
    • Manage estimating items
      • Add materials to an estimating job
      • Find estimating items
      • Modify estimating items
      • Copy and multiply estimating items
      • Delete an estimating item
      • Manage production codes
      • Load estimating materials to other jobs
    • Combine materials in the Estimating module
    • Import files to and export files from the Estimating module
    • Use Trimble Connect with an estimating job
    • Create a proposal
  • Inventory
  • Project Management
  • Production Control
  • Purchasing
  • Order Entry
  • Troubleshooting
  • Tekla PowerFab Go

 


Highlights of
Tekla PowerFab 2023


Manage estimating items

Tekla PowerFab
2023
Tekla PowerFab Tekla PowerFab GO

Manage estimating items

You can manage the material items in an estimating job in different ways.

For more information, see the following links:
Add materials to an estimating job
Copy and multiply estimating items
Modify estimating items
Delete an estimating item
Manage production codes
这些内容是否有用?
上一步
下一步