You can view the project summary
report of project management jobs that are linked to one or more of the following
modules: Production Control, Combining, Estimating, and Purchasing.
By creating the project summary,
you can do the following:
- Compare the materials used in Production Control with the estimated materials and the prepurchased materials in Combining
- View the total values for purchased materials, materials moved from other
jobs, and materials moved to scrap
- View the current production status: See which materials are listed on a
purchase order and have not yet been received, which materials are in stock
but have not been processed, and which have been charged to the job and
taken from stock
-
In the Project
Management module, double-click a job to open it.
-
In the upper-right corner of
the Project
Management dialog box, click Project
Summary.
The Report
Selection dialog box opens.
-
Select the report that you want to view,
print, or export.
The Full
Project Summary report provides a snapshot of the current status of the project and
the module components that are currently linked to each other.
Estimating, Combining, Production Control: The columns show the quantity of pieces together with the total
material weight for each shape used in the job. This information helps
you to track materials by shape.
On
Order: The materials are on a purchase order.
In
Stock: The materials have been received.
Charge: The materials have been taken from
stock, that is, they have been cut and are in the fabrication
process.
- A purchase order summary, which shows all the purchase orders
associated with the project management jobs.
- An inventory transfer summary, which shows materials transferred
from a different job into the current project management job.
- The production and shipping status summary report, which shows the
quantity of pieces that have been processed. The items are sorted by
the route assigned in Production Control. The production and shipping status information is automatically
updated when changes are made.
The project summary
reports also have reports for all the breakdown areas, but these reports
are not displayed by default. To customize the displayed reports, click
Edit
Report Types in the Report
Selection dialog box. See also Create user-defined reports for customizing.
-
Do one of the following:
To |
Do this |
View the report |
Click View. The
report opens in Tekla
PowerFab Report Viewer. You
can use the Email
Excel and Email
PDF buttons at the top of the Tekla
PowerFab Report Viewer window to email the report via Microsoft
Outlook. |
Print the report |
- Change the number of the printed copies by clicking
the plus (+) and minus
(-) buttons.
- Click Print.
The Select
Printer dialog opens.
- Click a printer to select it.
- Click OK.
|
Export the report |
- Click Export
The Export
Options dialog opens.
- In the Export
Format list, select an export format.
- To select the location where you want to save the
exported file, click Browse.
- Browse to the location where you want to save the
exported file, and click Save.
You can modify the file name as needed.
- To attach the exported file to a Microsoft
Outlook email and send it to a recipient, select the
Attach to
Email checkbox.
- To open the file after exporting it, select the
Open Exported Document checkbox.
- To export the file, click Export.
|