Update the links to a drawing log
Use the Refresh command to update the links to the drawing log. If you have recently attached files to drawings manually, you can also use the Refresh command to see the newly attached files in the drawing log. The attached files are also updated when you close and re-open a drawing log.
The links to the current drawing log are updated.