Use the
Production Status command to view the current production station of items in a single production control
job or a group of jobs.
-
Click the
Maintenance ribbon tab.
-
On the menu, select
.
-
In the left-hand pane of the Production Status Filters dialog box, select check boxes next the summary fields to include the related
properties as columns in the summary of the production statuses.
Selecting summary field check boxes can make it easier to view the overall
production progress of multiple jobs.
-
To only view the status of
specific types of items, select a filter type in the Type list, and click Select.
For example, to only view
particular jobs, select Job
# and click Select.
-
In the Filter dialog box, do one of the following depending on the filter
type:
- Click the arrow buttons to move the items that you want to view to the Included list.
- Type the maximum and minimum values for the items that you want to view.
-
Click
OK.
To further limit the visible items, repeat steps 3 to 5 for all necessary
filter types.
-
At the bottom of the Production Status Filters dialog box, select check boxes next to the information that you want to show
in the production status summary.
You can select to show the TFS status, weight, gross weight, assembly weight,
or gross assembly weight.
-
Click
OK to view the production statuses of selected items.
The Production Status dialog box opens, displaying a summary of the production statuses of items in the
selected production control jobs.
If necessary, you can export the production status summary to Microsoft
Excel to save the production status information. Right-click in the display are of the
Production Status dialog box, and in the context menu, select Export to
Excel.