Résumé of issue
This issue relates to Snow Loading and the US Head Code with the Snow Load Action Code set to ASCE7 2016 only. For Roof Projection and Parapet Snow Drift loads to Clause 7.8 of ASCE7-16, the Importance factor value was used directly in the calculation of the drift height hd rather than its square root per the equation of…