2022i SP7: New features, improvements, and important fixes
The latest Tekla PowerFab service pack is available in Tekla Downloads.
The latest Tekla PowerFab service pack is available in Tekla Downloads.
Número de defeitos | Área de desenvolvimento | Descrição |
---|---|---|
EPM-7585 | Estimating | When performing a combining run, sizes not used in the job might appear in run-specific pricing maintenance. This issue has now been fixed. |
EPM-7485 | Project management | Previously, in Project Management, the AIA G702 and G703 reports formated certain job numbers as a date. This issue has now been fixed. |
EPM-7570 | Production control | In the Production Control Shipping Ticket reports, the PlannedShipDate field is now available in the Stimulsoft Reports designer. |
EPM-7911 | Purchasing | Previously, exporting purchase orders to Trimble Viewpoint from the Select Requisition/Purchase Order dialog box did not prompt for the company code, sending a blank value to the export report. This issue has now been fixed. |
EPM-7745 | Inventory | Splice Packages that use material of a variety of grades as sources now receive a grade that is present among the source material. The drop receives the grade of the chosen material to drop when TFS is performed. |
EPM-7854 | Inventory | Previously, in Inventory, when selecting a line item, a Save changes? prompt could appear when no changes were made in the inputs on the previously selected line item. This issue has now been fixed. |
EPM-7613 | Combining | Previously, when combining split tee shapes into full beams, the value grade substitutions were not being considered. This issue has now been fixed. |
EPM-7937 | Tekla EPM Go | In the Remote Monitor settings, the info option has been removed from the Log Level selection. The default selection is now debug. |