Copy a production control job
You can copy an existing job to use it as the base of a new similar job. Copying an existing job makes creating the new job quicker, as you do not have to set all properties manually or create items one by one.
- In the Production Control Job Maintenance dialog box, select the job that you want to copy..
- At the bottom of the dialog box, click Copy.
- Type a number for the new job.
- Click OK.