Set and update sequences
You can set and update the sequences of main mark items in a production control job.
Note: You should set sequences before combining materials for purchase.
- In the Select Production Control Job dialog box, open a job and click the Production Control ribbon tab.
-
On the menu, select
Modify
Data > Set
Sequences.
The Set Sequences dialog box opens.
-
Click the arrow buttons to move
the items that you want to add to the same sequence to the right side of the
dialog box.
You can also click Filter to filter the list of items based on any property.
Quantity to Update: If you only want to add a specific number of pieces to the sequence, select the item on the right side of the dialog box and type a new value in the field.
Update Sequence: Select the checkbox and type the new number in New Sequence.
Update Lot #: Select if you want to update the lot number and type the new number in New Lot #.
-
Click Update
Sequences.
You are prompted to confirm the updates.
-
Click Yes.
The sequences are set.
- To close the dialog, click the Close button (X) in the upper-right corner.