Verify material links between Production Control and Purchasing
Use the Verify Links command to verify that all material in Production Control is currently linked to purchasing. Using the Verify Links command is a quick way to verify that the material links between Production Control, Requisitions, and Inventory are maintained. For example, using this command can be useful when importing revised drawings.
- In the Production Control dialog box, click the Production Control ribbon tab.
- On the menu, select .
- In the Verify Links dialog box, check that all material items are linked to purchasing.
- Click OK to close the dialog box.