View all changes since importing the bill of materials

Tekla PowerFab
2022i
Tekla PowerFab Tekla PowerFab GO

View all changes since importing the bill of materials

You can view and review all changes that have been made in a production control job since a bill of materials has been imported. Use the History of Changes command.

  1. In the Production Control dialog box, click the Production Control ribbon tab.
  2. On the menu, select History of Changes > History of Changes.
  3. In the History of Changes dialog box, select the items whose changes you want to view in the available lists

    To view all items, clear all text from the lists.

  4. Click OK.
  5. To only include changes of specific properties, click the arrow buttons to move the properties that you want to include to the Included list.
  6. If necessary, filter the changes:

    To

    Do this

    Filter changes by user

    1. In the Filters section, click Edit on the right side of the User filter.

    2. Click the arrow buttons to move the users whose changes you want to view to the Included list.

    3. Click OK.

    Filter changes by date

    1. In the Filters section, click Edit on the right side of the Date filter.

    2. Select the start (Min) and end (Max) dates in the calendars.

    3. Click OK.

  7. In the lower-left corner of the dialog box, select checkboxes to indicate if you want to include changes related to sequences, piece tracking, or load tracking.
  8. Click View History of Changes.
    The history of changes appears. The items in the dialog box are color-coded to show any changes that have been made:
    • Items highlighted with green have not been changed since they were imported.
    • Items highlighted with yellow have been changed since they were imported. The Type column shows how the items have changed.
  9. To close the dialog box, click the Close button (X) in the upper-right corner.
Was dit nuttig?
Vorige
Volgende