Tekla PowerFab 2024i SP2
The latest Tekla PowerFab 2024i service pack is available in
The latest Tekla PowerFab 2024i service pack is available in
결함 번호 | 개발 영역 | 설명 |
---|---|---|
EPM-9102 | Estimating | In the Import dialog, Bluebeam import is now merged with the Excel import and called Takeoff Import. |
EPM-9247 | Estimating | Previously, in Maintenance > Estimating, an error occurred in Formulas in Labor Code Maintenance when attempting to edit the plate shear formula. This issue has now been fixed. |
EPM-8888 | Project management | A totals line has been added to Summary Totals report (ProjectContract00150.mrt) |
EPM-8942 | Project management | Previously, in Project Management, changes to the RFI recipients were not saved if files were attached before saving the recipient changes. This issue has now been fixed. |
EPM-9236 | Project management | Previously, in Project Scheduling, an error occurred when using the Work Package # in the project breakdown and the project management job was linked to more than one production control job. This issue has now been fixed. |
EPM-9086 | Production control | Previously, in Production Control, the Quality Control Inspection (ProductionControl066.mrt) report did not display the instance numbers. This issue has now been fixed. |
EPM-9130 | Production control | Previously, when the user tried to access drawings through a work package on a job that is not linked to Project Management, the program crashed. This has been replaced with a proper error message. |
EPM-9152 | Production control | Previously, in Production Control, the sequencing information was not always updated correctly when the main mark was manually changed. This issue has now been fixed. |
EPM-9169 | Production control | Previously, the Production Control import could result in errors for shapes with a text description for the dimension format. This issue has now been fixed. |
EPM-9185 | Production control | Previously, in Production Control, the Drawing # input field was not displayed after updating to 2024i. This issue has now been fixed. |
EPM-9190 | Production control | Previously, in Production Control, when using the Add to Purchase Order option in load tracking using the One Summary Line option, the values were not sent correctly when the load included material that had been assigned but had not yet been loaded. This issue has now been fixed. |
EPM-9226 | Production control | Previously, the Production Control Excel import was ignoring the model weight field when it was mapped. This issue has now been fixed. |
EPM-9234 | Production control | Previously, in Production Control, the weight displayed on the work package reports was incorrect when the job was set to use imperial weight units. This issue has now been fixed. |
EPM-9249 | Production control | Previously, the Combining Run Compare dialog displayed incorrect quantity totals. This issue has now been fixed. |
EPM-9107 | Administration | When importing a file and the Translate Shapes/Grades dialog is visible, the user is now provided with an improved message when they do not have sufficient permissions to add an abbreviation. |
EPM-7866 | Purchasing |
In Inventory, Requisitions, and Purchase Orders, when a record is linked to on-hold parts, now only the first column in the grid is highlighted in red instead of all columns. |
EPM-9123 | Inventory | Previously, after updating to 2024i, the inventory PO # input field was not visible. This issue has now been fixed. |
EPM-8277 | Requisitions | The column Stock Qty has been added to the totals section in Combining Run Results. |
EPM-9132 | Integrations | The Production Control SDS/2 import now correctly separates washers and nuts that are shop vs. field. |
EPM-9138 | Integrations | The Production Control SDS/2 import can now add a new accessory part from the BOM that has no model counterpart. |
EPM-9159 | Integrations | Previously, the Production Control SDS/2 import was not mapping the drawing description field correctly. This issue has now been fixed. |
EPM-9301 | Tekla EPM Go | In PowerFab Go, the maximum size of a drawing file that can be opened has been increased to 26MB. |
EPM-9046 | Automated events | In Automated Events, work package reports are now available in the Report event type. |
EPM-9133 | Automated events | In Automated Events, the Trimble Viewpoint Job Costing Export and Trimble Viewpoint Receiving Export event types have been added to automate those exports. See Other improvements in Tekla PowerFab 2024i. |
EPM-9158 | Automated events | Previously, in Automated Events, an error occurred when running the inspection reports. This issue has now been fixed. |