Add piece tracking and load tracking information and loads to the current production control job
Use the Production/Shipping Entry dialog box to add information to the current product control job. You can add piece tracking information and loads, ship and unship loads, and add piece marks to trucks.
Note: The Production/Shipping Entry dialog box only allows you to add one item at a time.
To open the Production/Shipping Entry dialog box, do either of the following:
- Select .
- In the Production Control module, open a job and in the Production Control ribbon tab, select .
The Production/Shipping Entry dialog box opens on the Piece Tracking tab.
Add piece tracking information
The action is updated to the selected job. The action also appears in the History list at the bottom of the Production/Shipping Entry dialog.