Publish the production status to Trimble Connect
Use the Publish Status to Trimble Connect command to update the status of a production control job manually to Trimble Connect.
You can also create a Publish to Trimble Connect automated event to update the production status to Trimble Connect automatically.
- In the Production Control dialog box, click the Production Control ribbon tab.
- On the menu, select .
The production status is updated to Trimble Connect.