Manage the project schedule

Tekla PowerFab
変更済み: 18 11月 2024
2025
Tekla PowerFab

Manage the project schedule

You can create, view, and modify the project schedule of the current project in the Project Schedule dialog.

To access the Project Schedule dialog, do one the following:

To

Do this

Access the project schedule from the Project Management module At the bottom of the Project Management dialog, click Project Schedule.

The Select Project dialog opens. You can select multiple projects to provide a high-level view of the schedule status of these projects.

Access the project schedule from the Production Control module
  1. In the Production Control dialog, click the Production Control ribbon tab.
  2. On the menu, select Project Schedule.
Note: You can access the Project Schedule dialog from a production control job only if you have linked the production control job to a project management job.

The Project Schedule dialog opens. The Schedule Tasks dialog opens at the same time as well.

The Project Schedule dialog contains multiple tabs:

  • Baseline Plan: Set and modify the current project baseline
  • Schedule Tasks: Add, modify, move, and delete tasks that are on the project schedule
  • Project Breakdown: Divide a project into sub-tasks. Usually done by sequence or lot number, but it can also be done by category, sub-category, or pay category.
  • Gantt Chart: View and modify the dates and completion percentages of different tasks