Apply erection labor

Tekla PowerFab
変更済み: 8 3月 2024
2024i
Tekla PowerFab Tekla PowerFab GO

Apply erection labor

There are several ways of adding the total erection labor to the estimate.

You have the following options, for example:

  • Add a line item dedicated to erection labor:
    1. Open an estimating job.
    2. To add a new item, click New.
    3. Modify at least the following properties in the input area:

      In Shape, select CO.

      In Dimensions, type Erection labor.

      Either of the following:

      • To add hours of labor, in Erect Hrs, type the erection labor hours.
      • To add a lump sum, in Erect Cost, type the sum.
    4. Click Add.

    The costs automatically include the Erecting labor rate set in Maintenance > Estimating > Labor Rates.

    You can also apply erection labor hours or costs to an existing line item.

  • Apply an estimate extra to estimate line item:
    1. In Extra, select a value.

      For instructions on adding estimate extras, see Create estimate extras.

    2. Click Save.