2022i SP7: New features, improvements, and important fixes

Tekla PowerFab
2022i
Tekla PowerFab Tekla PowerFab GO

2022i SP7: New features, improvements, and important fixes

The latest Tekla PowerFab service pack is available in Tekla Downloads.

修正リスト

不具合番号 開発分野 説明
EPM-7585 Estimating

When performing a combining run, sizes not used in the job might appear in run-specific pricing maintenance. This issue has now been fixed.

EPM-7485 Project management

Previously, in Project Management, the AIA G702 and G703 reports formated certain job numbers as a date. This issue has now been fixed.

EPM-7570 Production control

In the Production Control Shipping Ticket reports, the PlannedShipDate field is now available in the Stimulsoft Reports designer.

EPM-7911 Purchasing

Previously, exporting purchase orders to Trimble Viewpoint from the Select Requisition/Purchase Order dialog box did not prompt for the company code, sending a blank value to the export report. This issue has now been fixed.

EPM-7745 Inventory

Splice Packages that use material of a variety of grades as sources now receive a grade that is present among the source material. The drop receives the grade of the chosen material to drop when TFS is performed.

EPM-7854 Inventory

Previously, in Inventory, when selecting a line item, a Save changes? prompt could appear when no changes were made in the inputs on the previously selected line item. This issue has now been fixed.

EPM-7613 Combining

Previously, when combining split tee shapes into full beams, the value grade substitutions were not being considered. This issue has now been fixed.

EPM-7937 Tekla EPM Go

In the Remote Monitor settings, the info option has been removed from the Log Level selection. The default selection is now debug.

役に立ちましたか?
前へ
次へ