Schedule, reschedule, and unschedule loads

Tekla PowerFab
Modificato: 8 Mar 2024
2024i
Tekla PowerFab Tekla PowerFab GO

Schedule, reschedule, and unschedule loads

You can either use the planned shipping date in the load properties or you can add unplanned loads directly onto the shipping calendar.

To

Do this

Schedule loads in the load properties
  1. Open Tekla PowerFab.
  2. In the Load Properties dialog box, click Planned Ship Date and enter a date.

  3. Tap Save to save the changes.

    The load will automatically be added to the shipping calendar in Tekla PowerFab Go on the specified date.

Schedule loads in the shipping calendar
  1. Tap .

    A side panel appears showing all the unshipped loads that have not yet been scheduled.

  2. If you wish, you can tap the Destinations and Jobs buttons to filter the unplanned loads by destination and job.
  3. Tap the three-dot ellipsis next to the load name.

  4. Tap Schedule.
  5. Enter the required date.
  6. Tap Apply to save the changes.
Schedule loads by dragging
  1. Tap to switch on the drag-and-drop tool.
  2. Drag the load onto the required day.

    The Planned Ship Date is automatically updated to the load properties inTekla PowerFab.

Note that the performance of the drag-and-drop tool depends on your device. The loads that are already marked and shipped are not available for the drag-and-drop function.

Reschedule loads
  1. Tap the three-dot ellipsis next to the load name.
  2. Tap Reschedule.
  3. Select the new date.
  4. Tap Apply to save the changes.

Alternatively, you can simply drag the load onto the required day.

Unschedule loads
  1. Tap the three-dot ellipsis next to the load name.
  2. Tap Unschedule.

    The load returns to the list of unplanned loads.

È stato utile?
Precedente
Successivo