Finalize a production control job
You can prevent any further changes to a production control job by using the Finalize command. After finalizing the production control job, you can no longer send material to purchasing.
The requisitioned items assigned to the job will be deleted, and inventory items reserved for the job will be unreserved.
Note: Finalizing a job is irreversible and cannot be undone.
- In the Select Production Control Job dialog box, select a job and click the Production Control ribbon tab.
- On the menu, select .
- If you are sure that you want to finalize the job, inthe Finalize Job dialog box, click Finalize.