BW Standard Horizontal Cladding Support (31)
Not version-specific
Tekla Structures
Environment
Not environment-specific
The BW Industries' Standard Horizontal Cladding Support macro can be used to define an arrangement of PJR sections between the rails of a bay. It can also provide the necessary connections between the top rail and an eaves beam, and diagonal ties as required.
Before and after
Image
Image
Notes
- Any modification of the selected parts will cause this macro to be updated.
- Only one eaves beam may be selected for inclusion in the bay.
- All rail lengths must be parallel.
- Eaves beam must be parallel to rails and above the last rail.
- The outside of the rails / eaves beams must align.
Selection order example
- Column
- Column
- As many rails as required and an eaves beam (if required)
- Click middle mouse button
Image
See also
BW cold rolled - Important informationBW Standard Horizontal Cladding Support (31) - Parts tab
BW Standard Horizontal Cladding Support (31) - Parameters tab