EPM-9621

Tekla PowerFab
2025
Tekla PowerFab
2024i
Tekla PowerFab Tekla PowerFab GO

Previously, large jobs could take a long time to open and use a large amount of memory to open the Project Schedule. The overhead required has now been reduced to not load the drawing and Bill of Material information until it is required, making the Project Schedule open more quickly.

Was this helpful?