EPM-9621
2025
Tekla PowerFab
2024i
Tekla PowerFab
Tekla PowerFab GO
Previously, large jobs could take a long time to open and use a large amount of memory to open the Project Schedule. The overhead required has now been reduced to not load the drawing and Bill of Material information until it is required, making the Project Schedule open more quickly.