Use the
View
Labor Details command to easily review the labor time of an item or a group of items, as well as the
labor time of the entire estimating job. If necessary, you can override the labor time
calculated by Tekla EPM and enter the labor time manually instead.
-
In the Estimating dialog box, select the items whose labor details you want to view.
To select multiple items, hold down
Ctrl.
To select a range of subsequent
items, hold down Shift.
-
Click the Estimating ribbon tab.
-
On the menu, select
View
Labor Details.
The Labor
Details dialog box opens.
The labor estimated time used
on the selected items, the displayed items, and the total estimating job are
viewed in a table, categorized by labor group.
-
If you want to enter labor time manually, do the following:
-
In the table, select and
right-click the labor time that you want to override.
-
-
Select if you want to enter the
labor time in hours or minutes.
-
Enter the desired labor time in the
Manual
Override field.
-
Click Set
Manual Override.
The items whose values have changed are highlighted with yellow. Other items
affected by the change are highlighted with blue.
If you want to remove the manual override and revert to the labor time
calculated by Tekla EPM, right-click the item and select Remove Manual Override.
-
To close the
dialog box, click the Close button (X) in the upper-right
corner.