Tekla PowerFab 2025 SP4

Tekla PowerFab
Modificado: 27 Ago 2025
2025
Tekla PowerFab Tekla PowerFab GO

Tekla PowerFab 2025 SP4

 El paquete de servicio más reciente para Tekla PowerFab 2025 se puede descargar de

Trimble Downloads

Disable the ABM automatic linking upon PDC import

The Production Control Company Standards dialog now includes an option to prevent automatically linking a Production Control job to the corresponding Advance Bill job upon completing each import.

EPM-9800

Correcciones

Apply
Número de defecto Área de desarrollo Descripción
EPM-9935 Production control

Previously, in Production Control, in the Work Package dialog, the Plan tab showed incorrect units when viewing capacity by weight. This issue has now been fixed.

EPM-9899 Administration

Previously, in Administration, opening the Users Currently Logged In dialog could cause the application to hang. This issue has now been fixed.

EPM-9969 Integrations

Previously, when importing an SDS/2 file into Production Control, the detail drawing files might not have been loaded correctly into the drawing directory. This issue has now been fixed.

EPM-9972 Integrations

When exporting a job to ViewPoint Vista, a Cost Code is now only required if the Job Number is set to a non-blank value.

EPM-9873 Tekla PowerFab Go

Previously, in Maintenance > Production Control > Fabrication Maintenance > Department Maintenance, the Apply to Schedule option did not apply capacity changes correctly when shifts were added or deleted. This issue has now been fixed.

¿Le ha resultado útil?
Enviar
Anterior
Siguiente