Lista de correcciones de Tekla PowerFab y Tekla PowerFab Go

Tekla PowerFab
Modificado: 12 Mar 2025
2025
Tekla PowerFab

Lista de correcciones de Tekla PowerFab y Tekla PowerFab Go

Aquí se pueden encontrar las mejoras y correcciones implementadas en Tekla PowerFab y Tekla PowerFab Go 2025.

Correcciones

Número de defecto Área de desarrollo Descripción
EPM-9621 Project management

Previously, large jobs could take a long time to open and use a large amount of memory to open the Project Schedule. The overhead required has now been reduced to not load the drawing and Bill of Material information until it is required, making the Project Schedule open more quickly.

EPM-8311 Production control

When importing a PFXT file into Production Control, Tekla PowerFab can now accept a partial quantity of an assembly without deleting the missing instances as long as they still exist in the model.
 

EPM-9298 Production control

When creating a cut list, if the new cut list has some items which match the filter and some that do not, you are prompted for what items to include. Previously, "Include only items matching the current filter" and "Don't save partially matched cutting details to the cut list" were acting the same. This issue has now been fixed.

EPM-9508 Production control

Previously, in the CNC Files dialog, the Hole Diameter field was blank. This issue has now been fixed.

EPM-8277 Requisitions

The column Stock Qty has been added to the totals section in Combining Run Results.

EPM-9301 Tekla EPM Go

In PowerFab Go, the maximum size of a drawing file that can be opened has been increased to 26MB.

EPM-9158 Automated events

Previously, in Automated Events, an error occurred when running the inspection reports. This issue has now been fixed.