2022 SP11: Nuevas funciones y mejoras
El paquete de servicio más reciente para Tekla EPM 2022 se puede descargar de
El paquete de servicio más reciente para Tekla EPM 2022 se puede descargar de
Número de defecto | Área de desarrollo | Descripción |
---|---|---|
EPM-8126 | Project management | Previously, when performing a batch insert in the Drawing Log, if a file exceeding the 25-character drawing number limit was found, it was skipped. Then all subsequent files were also skipped. This issue has now been fixed. |
EPM-8052 | Production control | Previously, when importing into Production Control with the Prompt to confirm import fields option enabled, import errors occurred when excluding the shape and grade fields. This issue has now been fixed. |
EPM-8145 | Production control | Previously, when using MySQL 8.0, adding material to a load that is shipped from an intermediate destination resulted in an error. This issue has now been fixed. |
EPM-8090 | Purchasing | Previously, a purchase order exported to Viewpoint did not honor the metric vs. imperial Company Standard. This issue has now been fixed. |
EPM-8132 | Automated events | Previously, automated event emails that include high-ASCII or Unicode characters were converting those characters to "?". This issue has now been fixed. |