Administrator's release notes: Ribbon updates

Tekla Structures
2022
Tekla Structures

Administrator's release notes: Ribbon updates

If you have customized the ribbon, the changes made in the new Tekla Structures version are not visible. Check the changes and add them to your customized ribbon.

Check the changes

Compare the original ribbon with the changes that you have made.

You can check what has been added and removed, and what has been moved to different tabs. See the Check changes section in Customize the ribbon.

Add changes to your customized ribbon

If you have customized the ribbon, update the ribbon to include the changes made in the new Tekla Structures version.

  1. Update the Rebar tab.
    1. Create a new drop-down button called Assembly.
    2. Drag and drop Assembly between Edit and Coupler.
    3. Drag and drop new commands to Assembly.
    4. Right-click Assembly, then select Text > Command: Full text.
  2. Update the View tab.
    1. Drag and drop the new Create model view on floor levels command to the New view drop-down button.
    2. Drag and drop new commands to the Rendering drop-down button.
  3. Update the Drawings & Reports tab.
    1. Create a new drop-down button called Create fabrication drawing.
    2. Drag and drop the commands from Fabrication to Create fabrication drawing.
    3. Drag and drop Create GA Drawing and Master drawing catalog from Create drawings to the ribbon.
    4. Delete Create drawings from the ribbon.
Was this helpful?
Previous
Next