Snow wizard (ASCE 7)
Summary
You can use the Snow wizard... to define sufficient site information to calculate the snow loadcases.
Location
- Ensure the snow loading code is set as ASCE 7.
- On the Load tab, click
Content
Button, command or option | Description | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Page 1 - Basic data (ASCE 7 Snow wizard) | The following basic data is required: | ||||||||||||||||||||||||
Ground snow load | (No default) | ||||||||||||||||||||||||
Terrain Category |
Options are:
|
||||||||||||||||||||||||
Exposure |
Options are:
|
||||||||||||||||||||||||
Exposure factor, Ce |
Ce is determined from the following table:
|
||||||||||||||||||||||||
Thermal Condition |
Option are:
|
||||||||||||||||||||||||
Thermal factor, Ct |
Ct is determined from the following table:
|
||||||||||||||||||||||||
Risk Category |
Option are:
|
||||||||||||||||||||||||
Snow Importance factor, Is |
Is is determined from the following table:
|
||||||||||||||||||||||||
Flat Roof Snow load, , pf |
pf is determined from the following: pf = 0.7 * Ce * Ct * Is * pg |
||||||||||||||||||||||||
Next | Takes you to the next page. | ||||||||||||||||||||||||
Page 2 - Snow loadcases (AISC Snow wizard) | This page is used to specify the loadcases as follows: | ||||||||||||||||||||||||
Minimum Snow Load |
Option are:
|
||||||||||||||||||||||||
Balanced Snow Load |
Option are:
|
||||||||||||||||||||||||
Unbalanced Snow Load |
Option are:
You can select between 1 and 4 cases to generate (1 Unbalanced..., 2 Unbalanced, etc.) |
||||||||||||||||||||||||
Draft Snow Load |
Option are:
You can select between 1 and 4 cases to generate (1 Unbalanced..., 2 Unbalanced, etc.) |
||||||||||||||||||||||||
Rain on Snow Surcharge |
Option are:
|
||||||||||||||||||||||||
Finish | Completes the Snow wizard... and sets up the loadcases based upon the input. |