Open the Production Control module

Tekla PowerFab
Modified: 10 Mar 2026
2026
Tekla PowerFab Tekla PowerFab GO

Open the Production Control module

To manage the production process, open the Production Control module.

At the top of the Tekla PowerFab window, click Production Control button.

The Select Production Control Job dialog opens. You can view all existing jobs

Note:
  • Users with administrator rights need to grant the relevant access rights for other users on the Production Control tab in File > Administration. See Manage user permissions.
  • Jobs whose statuses are set to Closed are not shown by default. To show closed jobs, select the Show Closed Jobs checkbox.

Next, you can do the following:

  • Launch the Production Planner in Tekla PowerFab Go
  • Create a new job
  • Open or modify an existing job
  • Manage the documents attached to the job
  • Manage the submittals to the job
  • View the production dashboards
Was this helpful?
Submit
Previous
Next