View a drawing log

Modified: 16 Sep 2025 Tekla PowerFab 2025i Tekla PowerFab GO 2025i

View a drawing log

Drawing logs help to manage and control the drawings in the project.

  1. Open the project management job whose drawing log you want to view.
    The Project dialog of the selected job opens.
  2. Click Drawing Log.

    If you have enabled ProjectSight, you have ProjectSight on the list. See Trimble ProjectSight: Manage projects.

  3. On the context menu, select the drawing log that you want to open.

    All Drawing Logs opens the drawing log with no filter applied.

    The selected drawing log opens.

    The Drawing Log ribbon tab appears in the main window.

Was this helpful?
Submit
Previous
Next