Use the Publish Status to Trimble Connect command to update the status of a production control job manually to Trimble Connect.

You can also create a Publish to Trimble Connect automated event to update the production status to Trimble Connect automatically.

  1. In the Select Production Control Job dialog, open a job and click the Production Control ribbon tab.
  2. On the menu, select Export > Publish Status to Trimble Connect.

The production status is updated to Trimble Connect.