Verify material links between Advance Bill and Purchasing

You can verify that all material in Advance Bill is currently linked to purchasing by using the Verify Links command.

This is a quick way to verify that the material links between Advance Bill, Requisitions, and Inventory are maintained.
  1. Open a job.
  2. Click the Advance Bill ribbon tab, select Purchasing > Verify Links.

    The Verify Links dialog opens.

  3. Check that all material items are linked to purchasing.
  4. Click OK to close the dialog.