Advance Bill enhancements
See also the video Advance Bill of Materials (ABM) Improvements.
Enhancements in importing to Advance Bill
Fabricators and detailers can now work together with the same ABM settings. You can define global ABM settings in
for identifying changes that are critical for the ABM stage. You can share the settings with detailers.See the following:
When importing to the Advance Bill module, you have now increased transparency and control of changes due to the enhanced change management workflow.
You can now review and accept or reject the changes before completing the import. You can also launch the Trimble Connect model comparison tool to visualize the changes within the project model.
You can select to view the critical changes only as defined in Company Standards.
You can also save the changes for later and review the pending changes in an Advance Bill job.
You can now import a .pfxt file using the Import dialog in .
If you try to import a production control .pfxt file to Advance Bill, you get an error message.
See the following:
- Import files to Tekla PowerFab
- Import files to an Advance Bill job
- Manage changes to an Advance Bill job
For Advance Bill imports, you now encounter the Translate Shapes/Grades dialog whenever unrecognized shapes or grades are detected in the IFC file. See Translate unknown shapes and grades.
View linked materials
ABM is now connected to purchasing and inventory: You can now view the linked material items in other modules.
Clicking the Links opens the new ABM Reserved Details dialog. It helps you to find materials that are either on a requisition, purchase order, or in inventory, and tied to an ABM Mark that has not been linked to production control. You can also access the dialog from and from individual Advance Bill jobs.
See the following content:
Load info from Project Management to Advance Bill
You can now load information from the selected project management job to the Advance Bill job.
The Load Info button has been added to the Advance Bill Job Edit dialog.
See the following:
View links between Advance Bill and Production Control
The Production Control Links now shows links to Advance Bill material items.
See View material links in Production Control.
The Advance Bill also shows links to Production Control.
Advance Bill and Trimble Connect
You can now link an Advance Bill job to Trimble Connect.
- When launching the Model Viewer Interface and selecting , you can view the status of materials up to the point where they are linked to Production Control:
- Requisition
- On order
- In Stock
- Linked to Production Control
For information, see the following: .
New reports in Advance Bill
The following new reports have been added:
- Sorted by Sequence & Material
- Summary By Sequence
- Sorted By Material w/ Links (Material Links)
- ABM Explorer (five report types, all filterable by Shape/Grade/Sequence/Category/Comments)
- Sorted By Material w/ Status
Other improvements in Advance Bill
- When saving Combining Run Results, you are now prompted to select if you would like to save the ordered pieces to a requisition or purchase order. See Combine materials in the Advance Bill module.
- In Document Index, you can now find reports similar to the PDC import reports, detailing the events and changes that occurred during the ABM import.