Define company standard settings for Production Control
For each module, you can define company-level settings that are the default for all new jobs.
- Click the Maintenance ribbon tab.
- On the
menu, select .
The Company Standards dialog opens.
- Modify the settings on the various tabs as needed.
You can find further company standard settings by clicking the buttons.
- Define default input and display units for Production Control
- Define default combining optimizations for Production Control
- Define default suppliers for Production Control
- Define default categories and subcategories for Production Control
- Define default pay categories for Production Control
- Define load tracking settings
Define general settings
Define input settings
On the Input Settings tab, select how Tekla PowerFab interprets and displays the information in the Production Control module, if the information is from an imported bill of materials, or directly entered in the Production Control dialog.
Define import settings
On the Import Settings tab, set the default settings used when importing a bill of materials into Production Control.
Define report settings
Option | Description |
---|---|
Prompt for weight type (net/gross) | Select if you want to select whether to use net
or gross weight of materials for each report. The gross weight is the system weight as dimensioned in Tekla PowerFab, whereas the net weight is loaded from the CNC files added for items. If CNC files have not been added for the items included in the report, net weight cannot be used in the report. Gross weight is used instead. |
Cut List - Prompt to split cutting details to a quantity of one | Select if you want to create cut list reports
that show each quantity of inventory listed
separately. If the checkbox is cleared, multiple inventory pieces with the same exact cutting details are shown as a single inventory item in reports. |
Default | Select if you want to split cutting details to the quantity of one by default. |
Define settings for drawings on hold
You can flag drawings that are put on hold for Production and Purchasing.
When flagged for Production, people working on assemblies can stop and wait to see if changes are coming.
When flagged for Purchasing, you can make sure that materials from drawings that have been put on hold in the requisition stage do not move forward in the process.
Define planning settings (Preview)
You can define the first day of the production week. When you change the start day of the week, the production schedule is changed accordingly. You can also define the default planning view (hours or weight) that is utilized in Department Maintenance.
The new production planning features and the associated configuration are designated as Preview functionality for evaluation purposes. Although marked as Preview, the features are safe to use and evaluate in your production environment. We welcome your feedback concerning the feature. In response to feedback, the feature may be enhanced, updated, or discontinued without notice. As a Preview, the feature is provided "as-is" without the benefit of any Trimble warranty or indemnity.
You can submit feedback by mail to powerfab-preview-feedback-ug@trimble.com.
- Go to .
- Go to the Planning Settings tab.
- In Production Week Start, select the desired first day.
- In Default Planning View, select the desired view.
- Click Save.