Verify material links between Production Control and Purchasing
You can verify that all material in Production Control is currently linked to purchasing by using the Verify Links command. This is a quick way to verify that the material links between Production Control, Requisitions, and Inventory are maintained. This command can be useful when importing revised drawings, for example.
- In the Select Production Control Job dialog box, open a job and click the Production Control ribbon tab.
- On the menu, select .
- In the Verify Links dialog box, check that all material items are linked to purchasing.
- Click OK to close the dialog box.