When you have exported a
fabrication package from a model, you can import it to a production control job in Tekla
PowerFab.
When you are exporting an XML file from the Tekla
Structures versions later than 2023, you can choose the ZIP file format in
Export to Tekla PowerFab. After the export, you can
extract the ZIP file, and you can find the exported XML file along with the
Tekla 3D model format TRB file.
For instructions on exporting a
fabrication package from Tekla
Structures, see
Tekla PowerFab.
For an end-to-end procedure, see also the support article Tekla PowerFab eXchange Plugin 6.5.
-
Go to
.
The Import dialog box opens.
-
In the navigation tree on
the left, select Production Control and the file type that you want to import.
-
To select the file, click
the ellipsis button (…) and select the file you want
to import.
-
Click Open.
-
Click Import.
Tip: You can also
click Test
Import, which simulates the import process and checks for issues but does
not actually import any material.
The Production Control Job Edit dialog box opens.
-
In Job
#, either type the number or use the automatically populated number.
This depends on the settings you have in Job #
Increment in MaintenanceProduction ControlCompany Standards.
-
If you have an existing project management job and want to import drawings
along with the production control job, select a job in the Project Management Job list.
When you first import a job, type a release number in the
Release # field. This way, if you import new
items into the job later, Tekla
PowerFab will increase the
initial release number.
-
In Project Management Job, select the appropriate job and click Load
Info.
This populates
multiple fields.
-
To import, click Save.
The Import dialog box opens.
-
When prompted, click
Yes to use the Standard PDC Mappings.