Copy materials from one drawing to another

Use the Copy Drawing command to copy materials from one drawing into another drawing.

  1. In the Production Control dialog box, click the item whose drawing you want to copy.
  2. Click the Production Control ribbon tab.
  3. On the menu, select Modify Data > Copy Drawing.
  4. In the Copy Drawing dialog box, type a number for the new drawing.
  5. Click OK.
  6. Review the new mark numbers and change them according to your needs:
    1. In the list, select the mark that you want to change.
    2. Type a new mark number.

      Repeat steps a to b for all mark numbers that you want to adjust.

  7. Click Copy.

The Copy Drawing dialog box closes. The items in the original drawing are copied to the new drawing.