Production control job information in Tekla PowerFab Go

Tekla PowerFab
Modified: 4 Sep 2024
2024i
Tekla PowerFab Tekla PowerFab GO

Production control job information in Tekla PowerFab Go

You can view and manage production control job details in Tekla PowerFab Go.

  1. To open the projects view, do either of the following:
    • On the home page, tap Projects.
    • Tap the file menu button () and select Projects.

  2. To find the desired project, do any of the following:
    • To filter the projects according to job groups set in the Tekla PowerFab desktop application, in the all groups list, select the primary and secondary job groups.

      The leftmost all groups list contains the primary job groups, and the rightmost all groups list contains the secondary job groups.

    • To search for a job, type the job number in the Find Job field.
    Note: Only projects whose job status is set to Open in the Tekla PowerFab desktop application are available in Tekla PowerFab Go.
  3. To view and manage the project details, tap Open Project.
Was this helpful?
Previous
Next