Work packages in Tekla PowerFab Go
As a Production Manager, you can view and reprioritize work packages, reassign them to a new workshop, and put them on hold. As a shop-floor worker, you can see a list of relevant work packages and access the key areas of Tekla PowerFab Go for a specific work package, including drawings, assemblies and parts, cut lists, production tracking, production status, inspections, shipping, and dashboards (subject to permissions).
Access the Work Packages view
View the details of a work package
- Tap the work package name in Work Package #.
- Tap
.

Priority (in the upper-right corner): Tap to change the priority
Release: Tap to release or unrelease the work package
Set on hold: Tap to place the work package on hold or to remove the hold status
Edit: Tap to open the work package details for editing
Links on the right: Tap to view production status details by work package.
Depending on your selection, a new tab opens displaying all associated assemblies, drawings, cut lists, piece tracking results, production status, inspections, or shipping loads prefiltered by the corresponding work package
), and on the menu,
select 
: Opens the filter
dialog.
: Tap to manually
search by work package or job number
: Priority: Tap to
edit priority
: Opens a menu for
adding or removing columns
: Tap to
change the color scheme
: Drag and
drop to change the order of columns
.