Apply labor codes to an estimate

Tekla PowerFab
Modified: 8 Mar 2024
2024i
Tekla PowerFab Tekla PowerFab GO

Apply labor codes to an estimate

Labor codes are the primary method of applying labor timings to an estimate.

  1. Open an Estimating job.

    The Type column contains the labor codes applied to each estimate item.

  2. To apply a labor code to a new estimate item, select a labor code in Type in the input area.

    The total estimated hours in the summary area is updated.

    For information on the labor codes, see Labor codes.

  3. To view all labor operations and their labor times for the selected item, double-click the item. (Optional)

    The Labor Diagnostic dialog box opens.