2022i SP7: New features, improvements, and important fixes
The latest Tekla PowerFab service pack is available in Tekla Downloads.
The latest Tekla PowerFab service pack is available in Tekla Downloads.
Defect number | Development area | Description |
---|---|---|
EPM-7585 | Estimating | When performing a combining run, sizes not used in the job might appear in run-specific pricing maintenance. This issue has now been fixed. |
EPM-7485 | Project management | Previously, in Project Management, the AIA G702 and G703 reports formated certain job numbers as a date. This issue has now been fixed. |
EPM-7570 | Production control | In the Production Control Shipping Ticket reports, the PlannedShipDate field is now available in the Stimulsoft Reports designer. |
EPM-7911 | Purchasing | Previously, exporting purchase orders to Trimble Viewpoint from the Select Requisition/Purchase Order dialog box did not prompt for the company code, sending a blank value to the export report. This issue has now been fixed. |
EPM-7745 | Inventory | Splice Packages that use material of a variety of grades as sources now receive a grade that is present among the source material. The drop receives the grade of the chosen material to drop when TFS is performed. |
EPM-7854 | Inventory | Previously, in Inventory, when selecting a line item, a Save changes? prompt could appear when no changes were made in the inputs on the previously selected line item. This issue has now been fixed. |
EPM-7613 | Combining | Previously, when combining split tee shapes into full beams, the value grade substitutions were not being considered. This issue has now been fixed. |
EPM-7937 | Tekla EPM Go | In the Remote Monitor settings, the info option has been removed from the Log Level selection. The default selection is now debug. |