Use the Load All
Selected command to add the selected production control materials to a truck
load.
-
In the Production Control dialog box, click the items that you want to load to select
them.
To select multiple items, hold down
Ctrl.
To select a range of subsequent
items, hold down Shift.
-
Click the Production Control ribbon tab.
-
On the menu, select
.
-
In the Loads -
Add Material dialog box, click the arrow buttons to move the items that you want to load to the Included list.
-
If you only want to load a particular number of pieces, select the item in the
Included list and type the number of pieces to be loaded in the Qty field.
-
Click the arrow on the right side of
Load
# field and click the load to which you want to add the items.
Note that you can only select loads that have already been added in the
Loads dialog box. For more information on adding loads, see Create, modify, and delete loads.
The total capacity and weight of the load is displayed at the bottom of the
Loads -
Add Material dialog box.
-
If necessary, click the arrow on the right side of the Date
Loaded field, and select another loading date in the calendar.
-
Click Add
Material.
The items are added to the selected load. The items will be marked as loaded in the
Loads dialog box.