Update the links to a drawing log

Tekla PowerFab
2022
Tekla PowerFab Tekla PowerFab GO

Update the links to a drawing log

Use the Refresh command to update the links to the drawing log. If you have recently attached files to drawings manually, you can also use the Refresh command to see the newly attached files in the drawing log. The attached files are also updated when you close and re-open a drawing log.

  1. On the right side of an open project management job, click Drawing Log.
  2. In the context menu, select the drawing log.

    Note that the All Drawing Logs option opens a drawing log that lists all drawings that you have added.

  3. In the open drawing log, click the Drawing Log ribbon tab.
  4. On the menu, select Refresh.

The links to the current drawing log are updated.