Define load tracking settings
In the Load Tracking Settings dialog box, you can manage which fields and options are available when adding loads in the Load Tracking dialog box.
Note that any changes made in the Load Tracking Settings dialog box are applied to both new and existing production control jobs.
-
At the bottom of the Company Standards dialog box, click the Load Tracking Settings button.
The Load Tracking Settings dialog box opens. Click the tabs at the top of the dialog box to modify the visibility of different items in the Load Tracking dialog box.
Adjust trailer number settings
Adjust the load tracking fields
The Carrier, Load Category 1, Load Category 2, Load Category 3, and Shipped From tabs each represent a user-defined field that you can add to the Load Tracking dialog box. The fields can be re-named and adjusted, so that you get all the necessary fields and options.
Adjust receiving date settings
Close the Load Tracking dialog box
-
Click OK at the bottom of the dialog box, or click the Close button (X) in the upper-right corner.