Define company standard settings for Production Control
In the Company Standards dialog box, you can create default settings that become the user standard that is used in each production control job. You can define settings regarding data input, material import settings, and reports. If necessary, you can also change the settings on a job by job basis.
-
Click the Maintenance ribbon tab.
-
On the menu, select .
The Company Standards dialog box opens on the General tab.
-
Modify the company standard settings on the General, Input Settings, Import Settings, and Report Settings tabs according to your needs.
-
Click the buttons at the bottom of the Company Standards dialog box to further modify company standard settings.
For more information, see the following links:
Do not click Save until you have modified all necessary settings. Saving the settings closes the Company Standards dialog box.
Define general settings
Option |
Description |
---|---|
Job # Increment |
Allows you to select the default option
for automatic job numbering. The options are:
You can modify the job number when you create a new job. |
Keep Job Selection Screen Open |
When selected, the Select Production Control Job dialog box remains open after you have selected a production control job. |
Open to Filter Selection |
When selected, the Production Control Filters dialog box automatically opens when you open a production control job. In the Production Control Filters dialog box, you can set filters to only show the items that you want to see in the production control job. When you have set the filters, the job opens. |
Job # Regular Expression |
Allows the use of regular expressions to enforce a desired format for the job numbers. |
When changes to PDC break links to combined INV material |
Allows you to select how Tekla EPM handles situations where a material link is broken between Production Control and Inventory while importing a revised or modified bill of materials. Tekla EPM automatically unlinks all changed material. This prevents cutting materials to incorrect lengths. The options are:
Click the arrow on the right side of When changes to PDC break links to combined INV material field, and click a suitable option in the list to select it. |
TFS - Drop Job Reserve |
Allows you to select how Tekla EPM handles drop material when a take from stock operation has been performed. Note that you can select a different option for an individual job, if necessary. The options are:
|
Allow Cut List Grade Substitution |
When selected, Tekla EPM can use inventory stock materials with another material grade in cut lists. Note that Tekla EPM only allows grade substitutions that have previously been set up in the Shape / Grade / Size Maintenance dialog box. For more information, see Add grade substitutions. |
Warn when creating a cut list if parts are missing CNC files |
When selected, Tekla EPM alerts you when saving a cut list that contains parts without CNC files. |
Cut List Screens - Show Date/Time Changed |
When selected, the Cut Lists dialog box shows the date and time when the cut lists were last changed. |
Define input settings
On the Input Settings tab, select how Tekla EPM interprets and displays the information in the Production Control module, whether the information is from an imported bill of materials, or directly entered in the Production Control dialog box.
Define import settings
On the Import Settings tab, set the default settings used when importing a bill of materials into Production Control.