Copy a production control job

Tekla PowerFab
2021
Tekla PowerFab Tekla PowerFab GO

Copy a production control job

You can copy an existing job to use it as the base of a new similar job. Copying an existing job makes creating the new job quicker, as you do not have to set all properties manually or create items one by one.

  1. In the Production Control Job Maintenance dialog box, select the job that you want to copy..
  2. At the bottom of the dialog box, click Copy.
  3. Type a number for the new job.
  4. Click OK.
Was this helpful?
Previous
Next