When revising drawings, you can attach information about the revision changes. Tekla Structures displays this information alongside the revision number or mark. The revision date appears in the revision table. The revision number or mark is shown in the Drawing list , and the revision information can be included in reports. You can also add manual revision marks in an open drawing.
Tip: One example of the report using revision information is drawing_issue_rev.xsr , which shows the most recent revision dates of drawings.