You can add tracking information by piece
mark in the Piece
Tracking dialog box. You can record the stations that the piece mark has completed, the date, and
the hours used. Piece-tracking records can also be added if the station is set as the TFS
station in a route or assigned to an inspection.
-
In the Select Production Control Job, select a job.
-
Do either of the following:
The Station
Summary dialog box opens.
-
To record information for
completed items, click Add
Completed.
The Station - Add Completed dialog box opens.
-
Select a station in the
Station list.
-
Click the arrow buttons to move the items that have completed the selected station to the Included list.
If you cannot see all items
that should be available, try selecting the Include If Previous
Station Not Complete checkbox. When this checkbox is selected,
items that have not yet completed the previous station on the route are also
shown.
-
Click the arrow on the right side of the Completed
By list and select the user that is adding the piece tracking information.
-
Click the arrow on the right side of the Date field and select the completion date in the calendar.
-
Type the number of working hours
and minutes used, and select if they are calculated by piece or as a
total.
-
If necessary, type the batch ID of the selected items in the Batch
ID field.
Batch ID is a generic field
for grouping piece tracking entry items to provide more specific reporting.
For example, you can type the name of the employee who is adding the piece
tracking information.
-
To review the inspection test
records of the items before completing stations, click the Inspection button.
-
Click Add
Material to save the piece tracking information.
-
To close the Station
Summary dialog box, click the Close button (X) in the upper-right corner.