2021 SP1: New features and enhancements
Opravy
Číslo závady | Oblast vývoje | Popis |
---|---|---|
EPM-5297 | Setup | Tekla EPM now accepts Russian characters. |
EPM-5265 | Estimating | Previously when you imported an IFC file into the Estimating module, if an imported weld had two different weld types, only one type was used. This has now been fixed, so that separate weld records will be added for the estimate item for each weld type. |
EPM-5275 | Estimating | Previously, when you imported IFC files into the Estimating module, an error could occur if the page number value contained a trailing space. This has now been fixed. |
EPM-5292 | Estimating | Previously, when you modified multiple items with the Global Edit command in estimating jobs, an error could occur when you tried to update the Page field. This has now been fixed. |
EPM-5298 | Estimating | When you import IFC files into the Estimating module, welds are now associated with the pieces to which they belong, not the main pieces of assemblies. |
EPM-5304 | Estimating | Previously when you applied additional labor to an estimating item, selecting an option in the Length list sometimes resulted in an incorrect value being used for length. This has now been fixed. |
EPM-5308 | Estimating | Previously, the thickness of additional labor was shown as decimal inches instead of fractions of inches. This has now been fixed. |
EPM-5322 | Estimating | Move Down and Move Up buttons have been added for burn, drill, punch and well operations, so that you can change their position. When you apply additional labor to estimating items, the operations are now sorted by their Position value. Image
|
EPM-5325 | Estimating | Previously in Tekla EPM 2021, when you used the Tab key to navigate the Additional Labor dialog box, the order of fields was different from previous Tekla EPM versions. This has now been fixed. |
EPM-5333 | Estimating | Previously when you imported an IFC file into the Estimating module, the wrong piece was sometimes selected as the main member of the assembly when there were two instances of the same piece in a single assembly. This has now been fixed. |
EPM-5295 | Project management | In drawing logs, the Batch Insert command now accepts the following characters in file name prefixes and suffixes: * ? + $ ^ . {} [] () |
EPM-4254 | Production control | A Links button has been added near the lower-right corner Production Control dialog box. When you select production control items and click the Links button, the Links dialog box opens. This dialog box shows the properties of the requisition, inventory, and inventory history materials to which the selected production control items are linked. |
EPM-5286 | Production control | A Planned Ship Date setting has been added in the Load Properties dialog box, so that you can select the supposed ship date in the calendar. Image
Planned Ship Date and Planned/Actual Ship Date filters have also been added for production control jobs. When you use the Planned/Actual Ship Date filter, note that if the load has been shipped, the filter is applied to the Date Shipped value. If the load has not yet been shipped, the filter is applied to the Planned Ship Date value. |
EPM-5289 | Production control | Previously, the Reverse TFS option in the TFS Details dialog box did not work for users without administrative rights, even if the users had the Reverse TFS permission. This has now been fixed. |
EPM-5290 | Production control | The Find Item command in production control jobs now allows you to search for a piece mark without entering a main mark. |
EPM-5293 | Production control | Previously, the TFS Quantity was shown in the Quantity Not Linked column in production control jobs. This has now been fixed. |
EPM-5309 | Production control | Previously, when you were working with an IFC model and a production control job at the same time, the Filter from Model option was missing when you right-clicked in the production control job. This has now been fixed. |
EPM-5323 | Production control | In the Cut Lists dialog box, the descriptions of locked and not shared cut lists are now highlighted again. |
EPM-5338 | Production control | Previously in cut lists, when you cut linear items where the expected drop was greater than 0, if a manual drop of 0 was entered, the manual value was ignored and the cut was processed with the expected drop. This has now been fixed. |
EPM-5296 | Administration | Previously, an error occurred if an administrator tried to reset the password of a user whose user name was over 16 characters long. This has now been fixed. |
EPM-5311 | Inventory | Previously, lengths, weights, and prices in the Transaction History dialog box were always shown in Imperial units regardless of the company standard settings. This has now been fixed. |
EPM-5320 | Inventory | Previously in the Inventory module, taking from stock material items with length of 0 caused an error. This has now been fixed. |
EPM-5321 | Inventory | Previously in the Inventory module, the Find Serial # command did not select the correct material item if you searched for a non-serialized serial number. For example, serial numbers used for barcoding are non-serialized. This has now been fixed. |
EPM-5328 | Inventory | Previously, the quantity of items linked to production control jobs was not shown in the Inventory dialog box if the items were combined and the linked quantity was 0. This has now been fixed. |
EPM-5329 | Inventory | Previously, when you exported inventory information to Microsoft Excel using the Export to Excel context menu option, the item type was exported in a wrong format. This has now been fixed. |
EPM-5327 | Integrations | A new Sync combined material check box has been added in ProNest and SigmaNest integration settings. When the Sync combined material check box is cleared, inventory sync excludes already combined inventory stock. Image
|