Combine Material In Production Control

Tekla PowerFab 2026 - 2019 Combine Production Control Materials

Production Control – get those materials combined and priced!

In this installment we are combining the Production Control bill of materials and sending that combined list to a requisition.  The program automatically tracks all materials.  Your Production Control cut lists will be based upon the combining result.  When combining options are changed in Requisitions, the cut list is updated accordingly.  You may combine all materials, send all to a single requisition, and then filter that list to send certain items to different purchase orders.  All of this automation simplifies purchasing and tracking the materials.

We will work in the following:

• Combine Production Control Material
• Send to a Requisition
• Send Materials out for pricing
• Update the pricing

Image
PDC 1.png


Click the ‘Production Control’ drop down, select ‘Combine’, opening the ‘Select Combining Run’ window. Click ‘Mult’.
      
Image
PDC 2.png
     
Image
PDC 3.png

                           
After the ‘Mult’ button has been clicked, the ‘Combining Run Filters’ window opens.  Use the filter window to select specific materials groups to be combined.  For this example we will select Angle material. 

To select the angle material, first click ‘Shape & Grade’ in the ‘Combining Run Filters’ window left side list.  In the Shape & Grade window, click the left pointing double arrow button to de-select or move all items to the left side, then double click on ‘L’ shape, or click to highlight and then click the single right pointing arrow to move it to the ‘Included’ side. Click ‘OK’ to continue.

Image
PDC 4.png
    
Image
PDC 5.png

              
Returning to the ‘Combining Run Filters’ window, check your ‘Optimizations’.  Click the ‘Optimizations’ button at the bottom left, opening the ‘Combining Setup’ window.  Use this window to select material options. 

When not using Inventory materials, move all Inventory type options to the left side or ‘Optimizations Not Included’ and move ‘Warehouses Least-Scrap’ to the ‘Optimizations Included’ side.
       
Image
PDC 6.png
      
Image
PDC 7.png


When completed with selections, click ‘Mult’.

Image
PDC 8.png


When the combining completes, the ‘Combining Run Results’ window opens:

Image
PDC 9.png


Click the ‘Save Displayed Results & Close’ button, opening the ‘Select’ window for Requisitions or Purchase Orders.
Note – this ‘Save Displayed Results & Close’ selection is what makes the Production Control material cut list. 
    
Image
PDC 10.png
      
Image
PDC 11.png

 
For the purpose of this example, ‘Requisitions’ is selected:
   
Image
PDC 12.png
     
Image
PDC 13.png
      

Enter the Requisition number and description, click ‘Save’, opening the ‘Select Requisition’ window.  The latest requisition is highlighted, click ‘OK’ to move those combined materials to the new ‘Requisition’.

When the requisition material loading completes, the requisition window automatically closes.  Click the ‘Purchasing’ module tab at the top right of the FabSuite window, opening the ‘Select Requisitions/Purchase Order’ window.


Image
PDC 14.png


Click the top left tab for ‘Requisitions’ in the ‘Select Requisition/Purchase Order window.

Image
PDC 15.png


Click ‘Open’ to continue.

Image
PDC 16.png


While in the Requisition window, notice the information box at the bottom right.  The combining result for the highlighted display area item is shown. 

Send out this list for pricing:

Image
PDC 17.png


Click to select reports from the ‘Requisition’ drop down, click ‘Make Report in the ‘Requisition Report Filters’ window. 
          
Image
PDC 18.png
      
Image
PDC 19.png

           
Select the ‘Request for Pricing’ report, click ‘View’.

Image
PDC 20.png
   


Image
PDC 21.png



This report may be printed, saved and emailed as a ‘pdf’.  If using Windows Outlook email, a new email will be opened with the ‘Request for Pricing’ PDF already attached when the ‘Email PDF’ button is clicked.

When pricing is returned you may update by individual line items or by groups using Global Edit. To use the ‘Global Edit’ feature, highlight a group of items – then select ‘Global Edit Selected’ at the ‘Requisition’ drop down.
      
Image
PDC 22.png
   
Image
PDC 23.png

 
You may click on an item, change the ‘Base Price’ amount and click ‘Save’. Note that when you right click in ‘Base Price’ a drop down select menu appears to change the pricing units, if needed. 

While in the Global Edit window, checkmark the left side box of ‘Base Price’ and enter the new price.  Global Edit Base Pricing Units may be changed by ‘Right click’ selection in the Global Edit window.  Click to checkmark the box for ‘Convert Base Price Units’ when updating the item.  Click the ‘Update button at the bottom to continue.

Image
PDC 24.png


To Update Pricing Maintenance, click the ‘Requisition’ drop down, click to select ‘Update Pricing Maintenance’.
 
Image
PDC 25.png


In the Pricing Update window, Select the ‘Supplier to Update’, click to highlight the items to be updated, and then click the ‘Update Pricing’ button. What you are doing is putting only the new prices to those specific items in the data base for Pricing Maintenance.  

Image
PDC 26.png


This is a very handy tool, expecially for those using the pricing database out of the Estimating Module!
In this installment we are working in material combining and updating pricing.

We reviewed how to:

• Combine Production Control Material
• Send to a Requisition
• Send Materials out for pricing
• Update the pricing

Next time we will work on un-combining and recombining to specific lengths – handy for making changes!


Was this helpful?
Submit